Proper set-up and management of the tuyere line begins with a perfectly straight tuyere line only possible using a puncher mounted H&S Refractory Drill, adjustable Heath & Sherwood Tuyeres, properly matched Tuyere Silencers, good temperature control with a Tuyere Pyrometer, and a state-of-the-art Gaspe Tuyere Puncher.
Ensures optimized air delivery and higher production rates
Provides longer refractory life and less downtime
Maintains a clean and efficient environment around the covering furnace